Project Management Methodologies Case Study Questions and Answers
Are You Looking for Project Management Methodologies Case Study Sample
As companies approach some degree of maturity in project
management, it becomes readily apparent to all that some sort of
standardization approach is necessary for the way that projects are managed.
The ideal solution might be to have a singular methodology for all projects,
whether they are for new product development, information systems, or client
services. Some organizations may find it necessary to maintain more than one
methodology, however, such as one methodology for information systems and a
second methodology for new prod- uct development.
The implementation and acceptance of a project management
methodology can be difficult if the organization’s culture provides a great
deal of resistance toward the change. Strong executive leadership may be necessary
such that the barriers to change can be overcome quickly. These barriers can
exist at all levels of management as well as at the worker level. The changes
may require that work- ers give up their comfort zones and seek out new social
groups.
Lakes Automotive
Lakes Automotive is a Detroit-based tier-one supplier to the
auto industry. Between 1995 and 1999, Lakes Automotive installed a project
management methodology based on nine life-cycle phases. All 60,000 employees
worldwide accepted the methodology and used it. Management was pleased with the
results. Also, Lakes Automotive’s customer base was pleased with the
methodology and provided Lakes Automotive with quality award recognition that
everyone believed was attributed to how well the project management methodology
was executed.
In February 2000, Lakes Automotive decided to offer
additional products to its customers. Lakes Automotive bought out another
tier-one supplier, Pelex Automotive Products (PAP). PAP also had a good project
management reputation and also provided quality products. Many of its products
were similar to those provided by Lakes Automotive.
Because the employees from both companies would be working
together closely, a singular project management methodology would be required
that would be acceptable to both companies. PAP had a good methodology based on
five life-cycle phases. Both methodologies had advantages and disadvantages,
and both were well liked by their customers.
QUESTIONS
- How do companies combine methodologies?
- How do you get employees to change work habits that have proven to be successful?
- What influence should a customer have in redesigning a methodology that has proven to be successful?
- What if the customers want the existing methodologies left intact?
- What if the customers are unhappy with the new combined methodology?
Ferris HealthCare, Inc.
In July of 1999, senior management at Ferris recognized that
its future growth could very well be determined by how quickly and how well it
implemented proj- ect management. For the past several years, line managers had
been functioning as project managers while still managing their line groups.
The projects came out with the short end of the stick, most often late and over
budget, because managers focused on line activities rather than project work.
Everyone recognized that proj- ect management needed to be an established
career path position and that some structured process had to be implemented for
project management.
A consultant was brought into Ferris to provide initial
project management training for 50 out of the 300 employees targeted for
eventual project manage- ment training. Several of the employees thus trained
were then placed on a com- mittee with senior management to design a project
management stage-gate model for Ferris.
After two months of meetings, the committee identified the
need for three different stage-gate models: one for information systems, one
for new products/ services provided, and one for bringing on board new
corporate clients. There were several similarities among the three models.
However, personal interests dictated the need for three methodologies, all
based upon rigid policies and procedures.
After a year of using three models, the company recognized
it had a problem deciding how to assign the right project manager to the right
project. Project man- agers had to be familiar with all three methodologies.
The alternative, considered impractical, was to assign only those project managers
familiar with that specific methodology.
After six months of meetings, the company consolidated the
three method- ologies into a single methodology, focusing more upon guidelines
than on policies and procedures. The entire organization appeared to support
the new sin- gular methodology. A consultant was brought in to conduct the
first three days of a four-day training program for employees not yet trained
in project management. The fourth day was taught by internal personnel with a
focus on how to use the new methodology. The success to failure ratio on
projects increased dramatically.
QUESTIONS
- Why was it so difficult to develop a singular methodology from the start?
- Why were all three initial methodologies based on policies and procedures?
- Why do you believe the organization later was willing to accept a singular methodology?
- Why was the singular methodology based on guidelines rather than policies and procedures?
- Did it make sense to have the fourth day of the training program devoted to the methodology and immediately attached to the end of the three-day program?
- Why was the consultant not allowed to teach the methodology?
BACKGROUND
By 1999, Clark Faucet Company had grown into the third
largest supplier of faucets for both commercial and home use. Competition was
fierce. Consumers would evaluate faucets on artistic design and quality. Each
faucet had to be avail- able in at least twenty-five different colors.
Commercial buyers seemed more interested in the cost than the average consumer,
who viewed the faucet as an object of art, irrespective of price.
Clark Faucet Company did not spend a great deal of money
advertising on the radio or on television. Some money was allocated for ads in
professional journals. Most of Clark’s advertising and marketing funds were
allocated to the two semiannual home and garden trade shows and the annual builders
trade show. One large builder could purchase more than 5,000 components for the
furnishing of one newly constructed hotel or one apartment complex. Missing an
opportunity to display the new products at these trade shows could easily
result in a six- to twelve-month window of lost revenue.
CULTURE
Clark Faucet had a non cooperative culture. Marketing and engineering
would never talk to one another. Engineering wanted the freedom to design new
products, whereas marketing wanted final approval to make sure that what was
designed could be sold.
The conflict between marketing and engineering became so
fierce that early attempts to implement project management failed. Nobody
wanted to be the project manager. Functional team members refused to attend
team meetings and spent most of their time working on their own “pet” projects
rather than the required work. Their line managers also showed little interest
in supporting project management.
Project management became so disliked that the procurement
manager refused to assign any of his employees to project teams. Instead, he
mandated that all project work come through him. He eventually built up a large
brick wall around his employees. He claimed that this would protect them from
the continuous conflicts between engineering and marketing.
THE EXECUTIVE DECISION
The executive council mandated that another attempt to
implement good project management practices must occur quickly. Project
management would be needed not only for new product development but also for
specialty products and enhancements. The vice presidents for marketing and
engineering reluctantly agreed to try and patch up their differences, but did
not appear confident that any changes would take place.
Strange as it may seem, nobody could identify the initial
cause of the conflicts or how the trouble actually began. Senior management
hired an external consul- tant to identify the problems, provide
recommendations and alternatives, and act as a mediator. The consultant’s
process would have to begin with interviews.
ENGINEERING INTERVIEWS
The following comments were made during engineering interviews:
- “We are loaded down with work. If marketing would stay out of engineering, we could get our job done.”
- “Marketing doesn’t understand that there’s more work for us to do other than just new product development.”
- “Marketing personnel should spend their time at the country club and in bar rooms. This will allow us in engineering to finish our work uninterrupted!”
- “Marketing expects everyone in engineering to stop what they are doing in order to put out marketing fires. I believe that most of the time the problem is that marketing doesn’t know what they want up front. This leads to change after change. Why can’t we get a good definition at the beginning of each project?”
MARKETING INTERVIEWS
- “Our livelihood rests on income generated from trade shows. Since new product development is four to six months in duration, we have to beat up on engineering to make sure that our marketing schedules are met. Why can’t engineering understand the importance of these trade shows?”
- “Because of the time required to develop new products [4 –6 months], we sometimes have to rush into projects without having a good definition of what is required. When a customer at a trade show gives us an idea for a new product, we rush to get the project underway for introduction at the next trade show. We then go back to the customer and ask for more clari- fication and/or specifications. Sometimes we must work with the cus- tomer for months to get the information we need. I know that this is a problem for engineering, but it cannot be helped.”
The consultant wrestled with the comments but was still
somewhat per- plexed. “Why doesn’t engineering understand marketing’s
problems?” pondered the consultant. In a follow-up interview with an
engineering manager, the fol- lowing comment was made:
“We are currently working on 375 different projects in
engineering, and that includes those which marketing requested. Why can’t
marketing understand our problems?”
QUESTIONS
- What is the critical issue?
- What can be done about it?
- Can excellence in project management still be achieved and, if so, how? What steps would you recommend?
- Given the current noncooperative culture, how long will it take to achieve a good cooperative project management culture, and even excellence?
- What obstacles exist in getting marketing and engineering to agree to a singu- lar methodology for project management?
- What might happen if benchmarking studies indicate that either marketing or engineering are at fault?
- Should a singular methodology for project management have a process for the prioritization of projects or should some committee external to the methodol- ogy accomplish this?
Creating a Methodology1
BACKGROUND
John Compton, The president of the company, expressed his
feelings quite bluntly at the executive staff meeting;
We are no longer competitive in the marketplace. Almost all
of the Requests for Proposal (RFP) that we want to bid on have a requirement
that we must identify in the proposal the project management methodology we
will use on the contract should we be awarded the contract. We have no project
man- agement methodology. We have just a few templates we use based upon the
PMBOK®Guide. All of our competitors have methodologies, but not us.
I have been asking for a methodology to be developed for
more than a year now, and all I get are excuses. Some of you are obviously
afraid that you might lose power and authority once the methodology is up and
running. That may be true, but losing some power and authority is obvi- ously
better than losing your job. In six months I want to see a method- ology in use
on all projects or I will handle the situation myself. I simply cannot believe
that my executive staff is afraid to develop a project man- agement methodology.
CRITICAL ISSUES
The executive staff knew this day was inevitable; they had
to take the initiative in the implementation of a project management
methodology. Last year, a consul- tant was brought in to conduct a morning
three-hour session on the benefits of project management and the value of an
enterprise project management method- ology (EPM). As part of the session, the
consultant explained that the time needed to develop and implement an EPM
system can be shortened if the company has a project management office (PMO) in
place to take the lead role. The consultant also explained that whichever
executive gets control of the PMO may become more powerful than other
executives because he or she now controls all of the project management
intellectual property. The executive staff fully understood the implication of
this and therefore became reluctant to visibly support project management until
they could see how their organization would be affected. In the meantime,
project management suffered.
Reluctantly, a PMO was formed reporting to the chief
information officer. The PMO was comprised of a handful of experienced project
managers that could hopefully take the lead in the development of a
methodology. The PMO con- cluded that there were five steps that had to be done
initially. After the five steps were done, the executive committee would
receive a final briefing on what had been accomplished. The final briefing
would be in addition to the monthly updates and progress reports. The PMO
believed that getting executive support and sign-offs in a timely manner would
be difficult.
The first step that needed to be done was the establishment
of the number of life-cycle phases. Some people interviewed wanted ten to
twelve life-cycle phases. That meant that there would be ten to twelve gate
review meetings and the project managers would spend a great deal of time
preparing paperwork for the gate
review meetings rather than managing the project. The decision was then made to
have no more than six life-cycle phases.
The second step was to decide whether the methodology should
be designed around rigid policies and procedures or go the more informal route
of using forms, guidelines, checklists, and templates. The PMO felt that
project managers needed some degree of freedom in dealing with clients and
therefore the more informal approach would work best. Also, clients were asking
to have the methodology designed around the client’s business needs and the
more informal approach would provide the flexibility to do this.
The third step was to see what could be salvaged from the
existing templates and checklists. The company had a few templates and
checklists but not all of the project managers used them. The decision was made
to develop a standardized set of documents in accordance with the information
in the PMBOK® Guide. The project managers could then select whatever forms,
guidelines, templates, and checklists were appropriate for a particular project
and client.
The fourth step would be to develop a means for capturing
best practices using the EPM system. Clients were now requiring in their RFP
that best prac- tices on a project must be captured and shared with the client
prior to the close- out of the project. Most of the people in the PMO believed
that this could be done using forms or checklists at the final project
debriefing meeting.
The fifth step involved education and training. The project
managers and functional organizations that would staff the projects would need
to be trained in the use of the new methodology. The PMO believed that a
one-day training pro- gram would suffice and the functional organizations could
easily release their people for a one-day training session.
QUESTIONS
- What can you determine about the corporate culture from the fact that they waited this long to consider the development of an EPM system?
- Can a PMO accelerate the implementation process?
- Is it acceptable for the PMO to report to the chief information officer or to someone else?
- Why is it best to have six or less life-cycle phases in an EPM system?
- Is it best to design an EPM system around flexible or inflexible elements? Generally, when first developing an EPM system, do companies prefer to use formality or informality in the design?
- Should an EPM system have the capability of capturing best practices?
Honicker Corporation1
BACKGROUND
Honicker Corporation was well-recognized as a high-quality
manufacturer of dashboards for automobiles and trucks. Although it serviced
mainly U.S. auto- motive and truck manufacturers, the opportunity to expand to
a worldwide sup- plier was quite apparent. Its reputation was well-known
worldwide but it was plagued for years with ultraconservative senior management
leadership that pre- vented growth into the international marketplace.
When the new management team came on board in 2009, the
conservatism disappeared. Honicker was cash rich, had large borrowing power and
lines of credit with financial institutions, and received an AA- quality rating
on its small amount of corporate debt. Rather than expand by building
manufacturing facili- ties in various countries, Honicker decided to go the
fast route by acquiring four companies around the world: Alpha, Beta, Gamma,
and Delta Companies.
Each of the four acquired companies serviced mainly its own
geographical areas. The senior management team in each of the four companies
knew the cul- ture in their geographic areas and had a good reputation with
their clients and local stakeholders. The decision was made by Honicker to
leave each company’s senior management teams intact provided that the necessary
changes, as estab- lished by corporate, could be implemented.
Honicker wanted each company to have the manufacturing
capability to sup- ply parts to any Honicker client worldwide. But doing this
was easier said than done. Honicker had an enterprise project management
methodology (EPM) that worked well. Honicker understood project management and
so did the majority of Honicker’s clients and stakeholders in the United
States. Honicker recognized that the biggest challenge would be to get all of
the divisions at the same level of project management maturity and using the
same corporatewide EPM system or a modified version of it. It was expected that
each of the four acquired companies may want some changes to be made.
The four acquired divisions were all at different levels of
project manage- ment maturity. Alpha did have an EPM system and believed that
its approach to project management was superior to the one that Honicker was
using. Beta Company was just beginning to learn project management but did not
have any formal EPM system although it did have a few project management
templates that were being used for status reporting to its customers. Gamma and
Delta Companies were clueless about project management.
To make matters worse, laws in each of the countries where
the acquired com- panies were located created other stakeholders that had to be
serviced, and all of these stakeholders were at different levels of project
management maturity. In some countries government stakeholders were actively
involved because of employment and procurement laws whereas in other countries
government stakeholders were passive participants unless health, safety, or environmental
laws were broken.
It would certainly be a formidable task developing an EPM
system that would satisfy all of the newly acquired companies, their clients,
and their stakeholders.
ESTABLISHING THE TEAM
Honicker knew that there would be significant challenges in
getting a project management agreement in a short amount of time. Honicker also
knew that there is never an acquisition of equals; there is always a “landlord”
and “tenants,” and Honicker is the landlord. But acting as a landlord and
exerting influence in the process could alienate some of the acquired companies
and do more harm than good. Honicker’s approach was to treat this as a project,
and each company, along with its clients and local stakeholders, would be
treated as project stakeholders. Using stakeholder relations management
practices would be essential to getting an agreement on the project management
approach.
Honicker requested that each company assign three people to
the project man- agement implementation team that would be headed up by
Honicker personnel. The ideal team member, as suggested by Honicker,
would have some
knowledge and/or experience in project management and be authorized by
their senior levels of management to make decisions for their company. The
representatives should also understand the stakeholder needs from their clients
and local stakeholders. Honicker wanted an understanding to be reached as early
as possible that each company would agree to use the methodology that was
finally decided upon by the team.
Senior management in each of the four companies sent a
letter of under- standing to Honicker promising to assign the most qualified
personnel and agree- ing to use the methodology that was agreed upon. Each
stated that their company understood the importance of this project.
The first part of the project would be to come to an
agreement on the method- ology. The second part of the project would be to
invite clients and stakeholders to see the methodology and provide feedback.
This was essential since the clients and stakeholders would eventually be
interfacing with the methodology.
KICKOFF MEETING
Honicker had hoped that the team could come to an agreement
on a companywide EPM system within six months. But after the kickoff meeting
was over, Honicker realized that it would probably be two years before an
agreement would be reached on the EPM system. There were several issues that
became apparent at the first meeting:
- Each company had different time requirements for the project.
- Each company saw the importance of the project differently.
- Each company had its own culture and wanted to be sure that the final design was good fit with that culture.
- Each company saw the status and power of the project manager differently.
- Despite the letters of understanding, two of the companies, Gamma and Delta, did not understand their role and relationship with Honicker on this project.
- Alpha wanted to micromanage the project, believing that everyone should use its methodology.
Senior management at Honicker asked the Honicker
representatives at the kickoff meeting to prepare a confidential memo on their
opinion of the first meet- ing with the team. The Honicker personnel prepared a
memo including the fol- lowing comments:
- Not all of the representatives at the meeting openly expressed their true feelings about the project.
- It was quite apparent that some of the companies would like to see the project fail.
- Some of the companies were afraid that the implementation of the new EPM system would result in a shift in power and authority.
- Some people were afraid that the new EPM system would show that fewer resources were needed in the functional organization, thus causing a downsizing of personnel and a reduction in bonuses that were currently based upon headcount in functional groups.
- Some seemed apprehensive that the implementation of the new system would cause a change in the company’s culture and working relationships with their clients.
- Some seemed afraid of learning a new system and being pressured into using it.
It was obvious that this would be no easy task. Honicker had
to get to know all companies better and understand their needs and
expectations. Honicker man- agement had to show them that their opinion was of
value and find ways to win their support.
QUESTIONS
- What are Honicker’s options now?
- What would you recommend that Honicker do first?
- What if, after all attempts, Gamma and Delta companies refuse to come on board?
- What if Alpha Company is adamant that its approach is best and refuses to budge?
- What if Gamma and Delta Companies argue that their clients and stakehold- ers have not readily accepted the project management approach and they wish to be left alone with regard to dealing with their clients?
- Under what conditions would Honicker decide to back away and let each company do its own thing?
- How easy or difficult is it to get several companies geographically dispersed to agree to the same culture and methodology?
- If all four companies were willing to cooperate with one another, how long do you think it would take for an agreement on and acceptance to use the new EPM system?
- Which stakeholders may be powerful and which are not?
- Which stakeholder(s) may have the power to kill this project?
- What can Honicker do to win their support?
- If Honicker cannot win their support, then how should Honicker manage the opposition?
- What if all four companies agree to the project management methodology and then some of the client stakeholders show a lack of support for use of the methodology?
Acquisition Problem1
BACKGROUND
All companies strive for growth. Strategic plans are
prepared identifying new products and services to be developed and new markets
to be penetrated. Many of these plans require mergers and acquisitions to
obtain the strategic goals and objectives rapidly. Yet, even the best-prepared
strategic plans often fail when based upon mergers and acquisitions. Too many
executives view strategic plan- ning for a merger or acquisition as planning
only with often little consideration given to implementation which takes place
when both companies are actually combined. Implementation success is vital
during any merger and acquisition process.
PLANNING FOR GROWTH
Companies can grow in two ways—internally or externally.
With internal growth, companies cultivate their resources from within and may
spend years attaining their strategic targets and marketplace positioning.
Since time may be an unavailable luxury,
meticulous care must be given to make
sure that all new developments fit the
corporate project management methodology and culture.
External growth is significantly more complex. External
growth can be obtained through mergers, acquisitions, and joint ventures.
Companies can pur- chase the expertise they need very quickly through mergers
and acquisitions. Some companies execute occasional acquisitions while other
companies have sufficient access to capital such that they can perform
continuous acquisitions. However, once again, companies often neglect to
consider the impact on project manage- ment after the acquisition is made. Best
practices in project management may not be transferable from one company to
another. The impact on project management systems resulting from mergers and
acquisitions is often irreversible, whereas joint ventures can be terminated.
Project management often suffers after the actual merger or
acquisition. Mergers and acquisitions allow companies to achieve strategic
targets at a speed not easily achievable through internal growth, provided the
sharing or combining of assets and capabilities can be done quickly and
effectively. This synergistic effect can produce opportunities that a firm
might be hard-pressed to develop by
itself.
Mergers and acquisitions focus on two components:
preacquisition decision- making and postacquisition integration of processes.
Wall Street and financial institutions appear to be interested more in the
near-term, financial impact of the acquisition rather than the long-term value
that can be achieved through com- bined or better project management and
integrated processes. During the mid- 1990s, companies rushed into acquisitions
in less time than the company required for a capital expenditure approval.
Virtually no consideration was given to the impact on project management and
whether or not project management knowl- edge and the expected best practices
would be transferable. The result appears to have been more failures than
successes.
When a firm rushes into an acquisition, very little time and
effort appear to be spent on postacquisition integration. Yet, this is where
the real impact of the acquisition is felt. Immediately after an acquisition,
each firm markets and sells products to each other’s customers. This may
appease the stockholders, but only in the short term. In the long term, new
products and services will need to be developed to satisfy both markets.
Without an integrated project management sys- tem where both parties can share
the same intellectual property and work together, this may be difficult to
achieve.
When sufficient time is spent on preacquisition
decision-making, both firms look at combining processes, sharing resources,
transferring intellectual property, and the overall management of combined
operations. If these issues are not addressed in the preacquisition phase, then
the unrealistic expectations may lead to unwanted results during the
postacquisition integration phase.
Lenore Industries had been in existence for more than fifty
years and served as a strategic supplier of parts to the automobile industry.
Lenore’s market share was second only to its largest competitor, Belle
Manufacturing. Lenore believed that the economic woes of the U.S. automobile
industry between 2008 and 2010 would reverse themselves by the middle of the
next decade and that strategic opportunities for growth were at hand.
The stock prices of almost all of the automotive suppliers
were grossly depressed. Lenore’s stock price was also near a ten-year low. But
Lenore had rather large cash reserves and believed that the timing was right to
make one or more strategic acquisitions before the market place turned around.
With this in mind, Lenore decided to purchase its largest competitor, Belle
Manufacturing.
PREACQUISITION DECISION-MAKING
Senior management at Lenore fully understood that the reason
for most acquisitions is to satisfy strategic and/or financial objectives.
Exhibit I shows the six reasons iden- tified by senior management at Lenore for
the acquisition of Belle Manufacturing and the most likely impact on Lenore’s
strategic and financial objectives. The strate- gic objectives are somewhat
longer term than the financial objectives that are under pressure from
stockholders and creditors for quick returns.
Lenore’s senior management fully understood the long-term
benefits of the acquisition, which were:
- Economies of combined operations
- Assured supply or demand for products and services
Postacquisition
Ingtegration
- Additional intellectual property, which may have been impossible to obtain otherwise
- Direct control over cost, quality, and schedule rather than being at the mercy of a supplier or distributor
- Creation of new products and services
- Put pressure on competitors by creating synergies
- Cut costs by eliminating duplicated steps
Lenore submitted an offer to purchase Belle Manufacturing.
After several rounds of negotiations, Belle’s Board of Directors and Belle’s
stockholders agreed to the acquisition. Three months later, the acquisition was
completed.
POSTACQUISITION INTEGRATION
The essential purpose of any merger or acquisition is to
create lasting value that becomes possible when two firms are combined and
value that would not exist separately. The achievement of these benefits, as
well as attaining the strategic and financial objectives, could rest upon how
well the project management value- added chains of both firms are integrated,
especially the methodologies within their chains. Unless the methodologies and
cultures of both firms can be inte- grated, and reasonably fast, the objectives
may not be achieved as planned.
Lenore’s decision to purchase Belle Manufacturing never
considered the compatibility of their respective project management approaches.
Project management integration failures were occurring soon after the
acquisition hap- pened. Lenore had established an integration team and asked
the integration team for a briefing on what the critical issues were that were
preventing successful integration.
The integration team identified five serious problems that
were preventing successful integration of their project management approaches:
- Lenore and Belle have different project management methodologies.
- Lenore and Belle have different cultures and integration is complex.
- There are wage and salary disparities.
- Lenore overestimated the project management capability of Belle’s per- sonnel.
- There are significant differences in functional and project management leadership.
It was now apparent to Lenore that these common failures
resulted because the acquisition simply cannot occur without organizational and
cultural changes that are often disruptive in nature. Lenore had rushed into
the acquisition with lightning speed but with little regard for how the project
management value- added chains would be combined.
The first common problem area was inability to combine
project manage- ment methodologies within the project management value-added
chains. This occurred because of:
- A poor understanding of each other’s project management practices prior to the acquisition
- No clear direction during the preacquisition phase on how the integration will take place
- Unproven project management leadership in one or both firms
- A persistent attitude of “we–them” in existence
Some methodologies may be so complex that a great amount of
time is needed for integration to occur, especially if each organization has a
different set of clients and different types of projects. As an example, a
company developed a project management methodology to provide products and
services for large pub- licly held companies. The company then acquired a small
firm that sold exclu- sively to government agencies. The company realized too
late that integration of the methodologies would be almost impossible because
of requirements imposed by the government agencies for doing business with the
government. The methodologies were never integrated and the firm servicing
government clients was allowed to function as a subsidiary, with its own
specialized products and ser- vices. The expected synergy never took place.
Some methodologies simply cannot be integrated. It may be
more prudent to allow the organizations to function separately than to miss
windows of opportu- nity in the marketplace. In such cases, “pockets” of
project management may exist as separate entities throughout a large
corporation.
Lenore knew that Belle Manufacturing services many clients
outside of the United States but did not realize that Belle maintained a
different methodology for these clients. Lenore was hoping to establish just
one methodology to service all clients.
The second major problem area was the existence of differing
cultures. Although project management can be viewed as a series of related
processes, it is the working culture of the organization that must eventually
execute these processes. Resistance by the corporate culture to effectively
support project man- agement can cause the best plans to fail. Sources for the
problems with differing cultures include:
- A culture in one or both firms that has limited project management exper- tise (i.e., missing competencies)
- A culture that is resistant to change
- A culture that is resistant to technology transfer
Postacquisition
Ingtegration
- A culture that is resistant to transfer of any type of intellectual property
- A culture that will not allow for a reduction in cycle time
- A culture that will not allow for the elimination of costly steps
- A culture that must “reinvent the wheel”
- A culture in which project criticism is viewed as personal criticism
Integrating two cultures can be equally difficult during
both favorable and unfavorable economic times. People may resist any changes to
their work habits or comfort zones, even though they recognize that the company
will benefit by the changes.
Multinational mergers and acquisitions are equally difficult
to integrate because of cultural differences. Several years ago, an American
automotive sup- plier acquired a European firm. The American company supported
project man- agement vigorously and encouraged its employees to become
certified in project management. The European firm provided very little support
for project manage- ment and discouraged its workers from becoming certified
with the argument that its European clients do not regard project management in
such high esteem as does General Motors, Ford, and Chrysler. The European
subsidiary saw no need for project management. Unable to combine the
methodologies, the American parent company slowly replaced the European
executives with American execu- tives to drive home the need for a singular
project management approach across all divisions. It took almost five years for
the complete transformation to take place. The American parent company believed
that the resistance in the European division was more of a fear of change in
its comfort zone than a lack of interest by its European customers.
Planning for cultural integration can also produce favorable
results. Most banks grow through mergers and acquisitions. The general belief
in the banking industry is to grow or be acquired. One midwest bank recognized
this and devel- oped project management systems that allowed it to acquire
other banks and inte- grate the acquired banks into its culture in less time
than other banks allowed for mergers and acquisitions. The company viewed
project management as an asset that has a very positive effect on the corporate
bottom line. Many banks today have manuals for managing merger and acquisition
projects.
The third problem area Lenore discovered was the impact on
the wage and salary administration program. The common causes of the problems
with wage and salary administration included:
- Fear of downsizing
- Disparity in salaries
- Disparity in responsibilities
- Disparity in career path opportunities
- Differing policies and procedures
- Differing evaluation mechanisms
When a company is acquired and integration of methodologies
is necessary, then the impact on the wage and salary administration program can
be profound. When an acquisition takes place, people want to know how they will
benefit indi- vidually, even though they know that the acquisition is in the
best interest of the company.
The company being acquired often has the greatest
apprehension about being lured into a false sense of security. Acquired
organizations can become resentful to the point of physically trying to subvert
the acquirer. This will result in value destruction where self-preservation
becomes of paramount importance to the workers, often at the expense of the
project management systems.
Consider the following situation. Company A decides to
acquire company B. Company A has a relatively poor project management system
where project man- agement is a part-time activity and not regarded as a
profession. Company B, on the other hand, promotes project management
certification and recognizes the project manager as a full-time, dedicated
position. The salary structure for the project managers in company B was
significantly higher than for their coun- terparts in company A. The workers in
company B expressed concern that “We don’t want to be like them,” and
self-preservation led to value destruction.
Because of the wage and salary problems, company A tried to
treat company B as a separate subsidiary. But when the differences became
apparent, project managers in company A tried to migrate to company B for
better recognition and higher pay. Eventually, the pay scale for project
managers in company B became the norm for the integrated organization.
When people are concerned with self-preservation, the
short-term impact on the combined value-added project management chain could be
severe. Project management employees must have at least the same, if not
better, opportunities after acquisition integration as they did prior to the
acquisition.
The fourth problem area that the integration team discovered
was the overestimation of capabilities after acquisition integration. Included
in this category were:
- Missing technical competencies
- Inability to innovate
- Speed of innovation
- Lack of synergy
- Existence of excessive capability
- Inability to integrate best practices
Project managers and those individuals actively involved in
the project manage- ment value-added chain rarely participate in preacquisition
decision-making. As a result, decisions are made by managers who may be far
removed from the project management value-added chain and whose estimates of
postacquisition synergy are overly optimistic.
Postacquisition
Ingtegration
25
The president of a relatively large company held a news
conference announc- ing that his company was about to acquire another firm. To
appease the financial analysts attending the news conference, he meticulously
identified the synergies expected from the combined operations and provided a
timeline for new products to appear on the marketplace. This announcement did
not sit well with the work- force who knew that the capabilities were
overestimated and the dates were unre- alistic. When the product launch dates
were missed, the stock price plunged and blame was erroneously placed upon the
failure of the integrated project manage- ment value-added chain.
The fifth problem area identified was leadership failure
during postacquisi- tion integration. Included in this category were:
- Leadership failure in managing change
- Leadership failure in combining methodologies
- Leadership failure in project sponsorship
- Overall leadership failure
- Invisible leadership
- Micromanagement leadership
- Believing that mergers and acquisitions must be accompanied by major restructuring
Managed change works significantly better than unmanaged
change. Managed change requires strong leadership, especially with personnel
experi- enced in managing change during acquisitions.
Company A acquires company B. Company B has a reasonably
good project management system, but with significant differences than from
company A. Company A then decides that “We should manage them like us,” and
nothing should change. Company A then replaces several company B managers with
experienced company A managers. This was put into place with little regard for
the project management value-added chain in company B. Employees within the
chain in company B were receiving calls from different people, most of whom
were unknown to them and were not provided with guidance on who to contact when
problems arose.
As the leadership problem grew, company A kept transferring
managers back and forth. This resulted in smothering the project management
value-added chain with bureaucracy. As expected, performance was diminished
rather than enhanced and the strategic objectives were never attained.
Transferring managers back and forth to enhance vertical
interactions is an acceptable practice after an acquisition. However, it should
be restricted to the ver- tical chain of command. In the project management
value-added chain, the main communication flow is lateral, not vertical. Adding
layers of bureaucracy and replacing experienced chain managers with personnel
inexperienced in lateral communications can create severe roadblocks in the
performance of the chain.
The integration team then concluded that any of the problem
areas, either individually or in combination with other problem areas, can
cause the project management value chain to have diminished performance, such
as:
- Poor deliverables
- Inability to maintain schedules
- Lack of faith in the chain
- Poor morale
- Trial by fire for all new personnel
- High employee turnover
- No transfer of project management intellectual property
Lenore now realized that it may have “bitten off more than
they can chew. ” The problem was how to correct these issues in the shortest
amount of time with- out sacrificing its objectives for the acquisition.
QUESTIONS
- Why is it so difficult to get senior management to consider the impact on pro- ject management during preacquisition decision-making?
- Are the acquisition objectives in Exhibit I realistic?
- How much time is really needed to get economies of combined operations?
- How should Lenore handle differences in the project management approach if Lenore has the better approach?
- How should Lenore handle differences in the project management approach if Belle has the better approach?
- How should Lenore handle differences in the project management approach if neither Lenore nor Belle has any project management?
- How should Lenore handle differences in the culture if Lenore has the better culture?
- How should Lenore handle differences in the culture if Belle has the better culture?
- How should Lenore handle differences in the wage and salary administration program?
- Is it possible to prevent an overoptimistic view of the project management capability of the company being acquired?
- How should Lenore handle disparities in leadership?